Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

Ireland

Dublin

Grid and planning constraints on new large loads have been a defining European case. Do not treat Dublin as an open market.

REQUIRES VERIFICATIONPreliminary

Large operating base. New MW is the constraint.

Displaced demand: Other European and Nordic sites; also a reason Asian/Australian energy-seeking sites get a hearing.

Cartographic night

Evidence

No evidence objects attached. Absence is not a low score.