Australia firstEOX mosaic offOpen-Meteo offGrid adapter offAnnounced ≠ deliverable

Cartographic night

Intelligence product

Where should the next gigawatt of compute be built?

Not a directory. A desk that tells a developer, a financier and a mayor whether announced megawatts can actually be energised — then sells the brief and the workbench.

What you buy

A gallery, a brief, a desk, an engine.

The public map is proof. The product is the right to run the tools and take the file. Limited on registration. Chamber for the rest.

01

The gallery

Public objects a buyer can inspect without an account: atlas, players, Australia, the Lansdown sample.

Open the atlas

02

Downloadable products

Site briefs, the pad pack, the failure file, the northern screen, the operator MW ladder. Markdown you can file.

See the products

03

The engine room

Search, compare, scenario, compatibility. Register for a limited desk. Pay (MOCK licence) for the rest.

Enter the engine room

04

A named desk

Developer, financier, mayor, operator. Same evidence. Different question. Identity in this browser until the kernel is live.

Register a desk

Access ladder

Register. Then pay for the engine.

Chamber is invoiced in production. v0.1 issues a MOCK licence in this browser so a buyer can inspect paid tools without a payment rail.

Gallery

Complimentary

No identity

Read the public objects. One sample brief. Proof that announced megawatts are not deliverable megawatts.

  • Atlas, Australia, players, projects
  • Townsville / Lansdown sample brief
  • Methodology and Data pages
  • No search, no compare, no scenario
Take the sample brief

Desk

Register

Complimentary · limited

A named desk in the engine room. Search the store. Three additional briefs. The rest remains behind Chamber.

  • Engine room, limited
  • Natural-language search
  • 3 additional site briefs
  • Australian pad pack and failure file
Register a desk

Chamber

AUD 12,000

Per desk / year · proposed, not billed

The paid workbench. A demonstration Chamber can be opened on the server. It is not a production entitlement and no payment is taken.

  • Everything on Desk
  • Compare pads
  • Scenario builder (500 MW, then change the numbers)
  • Compatibility profile (liquid cooling, water, floating)
  • Northern Australia screen and operator MW ladder
  • Unlimited site briefs
See Chamber

Syndicate

From AUD 48,000

On request · not self-serve

Multi-desk, custom objects, and kernel publish when OneNetwork is live. Invoiced. Not a checkout.

  • Everything in Chamber
  • Multiple desks under one organisation
  • Custom site objects (when scoped)
  • OneNetwork publish when the adapter is on
Request Syndicate

How to read this

Three desks, one object

A developer, a financier and a mayor open the same pad. They do not get three products. They get three questions over the same evidence.

Developer

Where can I actually build, and when can it be energised?

  • Pad, connection path, fibre diversity, cooling architecture, time-to-power.
  • Pad coordinates and seeded climate prose. The EOX mosaic and live weather are withheld until licensed.

Financier

What MW survives contact with the grid?

  • Announced is stored separately from deliverable. Confidence sits next to the range, not inside it.
  • Missing items are listed as gates, not as footnotes.

Mayor / state

What is real here, and what would fail in public?

  • Existing vs committed vs proposed vs speculative — labelled, not blended.
  • Approvals, contamination, cyclone, competing industrial load.

Material updates

What changed the map

  • 2025-12-23

    Lansdown geography — material transmission update

    Flinders Substation MID approved 23 December 2025. This is a committed CopperString node near Hughenden, not a Townsville campus reservation. Prospective regional capacity increases in the 2030s remain unallocated to compute.

  • 2026-07-22

    Weddell — announced GW, confidence preliminary

    NT exclusivity over 185 ha and GW-scale statements. Deliverable MW today remains the Darwin edge market (D1), not Weddell.

  • 2026-06-01

    Pilbara — fibre diversity improved

    Vocus Horizon lit. This changes the fibre story. It does not create spare NWIS megawatts.

  • 2026-06-01

    Liddell Battery commercially available

    500 MW / 2 h storage is operating. Do not file as 500 MW of IT load or as a campus offtake.

Start in the gallery

Townsville · Liddell · Weddell

One industrial pad with a 2032 transmission story. One retired power station with retained lines. One announced gigawatt with no FID. That is the product.

Funnel — seed, not a census

Announced is not deliverable

Compiled from the v0.1 seed, not a global census. Storage MW (Liddell Battery) is excluded from IT operating totals below when labelled separately.

  • IT operating

    8.5MW

    NEXTDC D1 + PH1. Not a national census.

  • Storage operating

    500MW

    Liddell Battery. Not IT load.

  • Announced compute

    1780MW

    Dominated by Beetaloo Digital 1,000 MW.

  • Power-secured

    508.5MW

    Includes storage. Not deliverable IT.

Australian pads

Open a dossier

All Australia

metropolitan industrial brownfield

REQUIRES VERIFICATION

Altona petrochemical precinct

Metropolitan industrial brownfield with historic electrical load.

5-year scenario
50–150 MW
Likely power
Not dated
Confidence
Moderate confidence

A compute developer and a grid offer.

metropolitan industrial brownfield

REQUIRES VERIFICATION

Botany Industrial Park — former Qenos

Sydney demand.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Moderate confidence

RAP completion.

post industrial post generation

REQUIRES VERIFICATION

Newcastle / Hunter River industrial waterfront

Industrial waterfront.

5-year scenario
100–400 MW
Likely power
Not dated
Confidence
Preliminary

A single controlled site.

post industrial post generation

REQUIRES VERIFICATION

Liddell / Muswellbrook — Hunter Energy Hub

Retired ~2 GW thermal plant.

5-year scenario
100–500 MW
Likely power
2032
Confidence
Moderate confidence

A published connectable MW figure.

northern energy frontier

REQUIRES VERIFICATION

Townsville / Lansdown Eco-Industrial Precinct

2,200 ha High Impact Industrial land under a single public owner.

5-year scenario
50–250 MW
Likely power
2035
Confidence
Moderate confidence

A published connectable MW figure for 2028, 2030, 2032 and 2035.

northern energy frontier

REQUIRES VERIFICATION

Darwin / Weddell industrial area

Live Singapore cable.

5-year scenario
0–500 MW
Likely power
2035
Confidence
Preliminary

FID.

northern energy frontier

REQUIRES VERIFICATION

Port Hedland / Boodarie Strategic Industrial Area

Industrial energy system.

5-year scenario
50–250 MW
Likely power
Not dated
Confidence
Moderate confidence

Spare MW.

northern energy frontier

REQUIRES VERIFICATION

Karratha / Maitland Strategic Industrial Area

Gas and LNG industrial system.

5-year scenario
50–200 MW
Likely power
Not dated
Confidence
Preliminary

Almost every verified MW, fibre and water figure.

Next action

Register a desk. Take a brief. Open the engine.

Compute Sentinel tracks the physical infrastructure behind global compute: power, transmission, fibre, land, cooling, approvals and delivery.