SITE-AU-NSW-BOTANY-QENOS-001
Botany Industrial Park — former Qenos
Qenos Botany · 16–20B Beauchamp Road, Banksmeadow
Sydney demand.
Site zoom
Sentinel-2 and live meteo
Cloudless mosaic on the pad, latest L2A granule, and Open-Meteo dry/wet bulb. Live weather is not a design-day and does not replace a climate study.
Sentinel-2 cloudless 2024 · Botany Industrial Park — former Qenos
Approximate pad · not a cadastral survey
Deliverable MW
Announced is not deliverable
Today
High confidence0 MW
No DC connection evidenced.
3 years
UnverifiedNot verified
Remediation is the near-term programme.
5 years
Preliminary50–200 MW
Sydney capacity is strategically scarce. That does not make this parcel deliverable.
10 years
Preliminary50–250 MW
Upper bound is a scenario after contamination and airport constraints are resolved.
- Sydney compute demand is real. Botany is inside that demand geography.
- Contamination (CHC, PHC, PFAS, asbestos) is evidenced and is a first-order gate.
- Sydney Airport OLS, port operations and community process are additional gates.
- Colliers commentary listed data centre among possible future uses for industrial land in the park. That is a broker comment, not a project.
Time to power
Earliest is not likely
Earliest plausible energisation
Preliminary2031
Assumes remediation, a new use DA, and a connection path.
Likely energisation
UnverifiedNot dated
No compute project exists to hang a likely date on.
Remediation and airport/port constraints sit in front of any electrical programme.
Why here
- Sydney demand.
- Port and subsea geography.
- Industrial brownfield that is actually turning over.
What is missing
- RAP completion.
- Owner compute intent.
- A grid offer.
- Airport-compatible envelope.
Workload fit
- AI inferenceConditionalBest metro-Sydney inference geography in this set, gated by contamination and airport.
- Cloud / hyperscaleConditionalStrategic Sydney capacity, but parcel scale and constraints are unresolved.
- Sovereign / defenceConditionalSydney sovereign cloud is a possible use.
- AI training / HPCFailsTraining-scale MW and community/airport constraints are a poor match.
- Edge / regionalFitsMetro-edge / port-adjacent.
- Industrial / mining AIFailsNot a resource basin.
Energy
Infrastructure existed for petrochemical load. Connectable spare MW is not verified.
- Grid / NSP
- NEM NSW · Ausgrid / Transgrid (parcel-level NSP not verified)
- Substation / voltage
- Historic industrial supply; spare MVA not published. · Not verified for the Qenos parcel.
- Generation
- Metro NSW. Not generation-rich.
- BESS / gas / RE
- None on site evidenced. Industrial park utilities exist; reuse not verified. No on-site REZ.
Required for scale
- 100 MWPreliminary
Completed RAP, DC planning pathway, and a real Ausgrid/Transgrid offer.
Fibre
Port Botany / Sydney metro. Subsea landings are in the Sydney geography, not on this parcel.
- Sydney CBD: 5 ms · Metro estimate.
- Melbourne: 12 ms · Intercapital typical.
- Singapore: — ms · Via Sydney CLS. Not measured from this lot.
Thermal / hazards
Temperate coastal Sydney.
Bay-adjacent heat rejection is a hypothesis. Zero municipal water remains the conservative default.
Cyclone: Not a cyclone geography.
Development
- landControl
- Qenos under administration; ESR/LAOP pathway. Re-verify title before reliance.
- planning
- Demolition DA approved May 2025 (stages 1–2). Remediation DA in preparation Oct 2025. No compute DA.
- environmental
- CHC, PHC, PFAS, asbestos evidenced.
- approvalStatus
- Demolition approved. Compute not applied for.
- remediation
- Required. RAP-driven.
- contamination
- CHCs, PHCs, PFAS, asbestos.
- tenure
- Industrial park, multiple owners.
- construction
- Demolition commenced/handed over to demolition contractors in 2025 reporting.
Risk
- environmental
PFAS and chlorinated hydrocarbons are evidenced. Residual risk will shape use and timeline.
- planning
Sydney Airport height and lighting constraints sit over this geography.
- power
Sydney metro power is constrained in several catchments. Parcel-level spare MW is unpublished.
Graph
- botany — IN → Sydney
- botany — NEAR → Port Botany
- botany — CONSTRAINED_BY → Sydney Airport
Evidence
- VerifiedExisting
Qenos entered voluntary administration on 17 April 2024. ESR, through LAOP, proposed a DOCA. Demolition DA for stages 1 and 2 was approved by Bayside Council in May 2025.
ESR / Botany Industrial Park · Botany Industrial Park community update July 2025 · published 2025-07 · accessed 2026-09-18
- High confidenceExisting
Environmental investigations identified chlorinated hydrocarbons, petroleum hydrocarbons, PFAS and asbestos in soils at the former Qenos Botany landholding.
Botany Industrial Park · Preparing for remediation works at former Qenos landholdings · published 2025-10-21 · accessed 2026-09-18