DimensionLiddell / Muswellbrook — Hunter Energy HubTownsville / Lansdown Eco-Industrial PrecinctDarwin / Weddell industrial areaPort Hedland / Boodarie Strategic Industrial Area
Potential campus MW (5-year scenario)100–500 MW50–250 MW0–500 MW50–250 MW
Power today0 MW0–50 MW0–7 MW1–2 MW
Power confidenceunverifiedunverifiedunverifiedunverified
Time to power (likely)203220352035Not dated
LandAGL publishes a 10,000 ha combined Bayswater and Liddell landholding. That is not the developable pad for a campus.2,200 ha precinct. Individual compute-suitable lots are not allocated. Lot configuration changes with tender outcomes.185 ha exclusivity at Weddell, ~30 km south of Darwin CBD, adjacent to a proposed Darwin Energy Hub. Exclusivity ≠ development consent.4,000 ha Strategic Industry. POSCO and Fortescue have allocations for iron processing. Do not treat the SIA as vacant.
FibreNot verified to the pad.Not verified to the precinct. Single-corridor risk to Brisbane is the default assumption until two routes are shown.A second international path (Bosun / Inligo) is planned, not a substitute for diverse laterals to Weddell.Horizon is described as a second route. Site diversity to a Boodarie lot is not surveyed.
WaterLake Liddell remains a key water asset for Bayswater. Surplus for a campus is not verified.Raw water pipeline from Ross Dam is in design — proposed, not operating. Not municipal potable by description.Not verified for GW-scale evaporative plant. Do not assume it.Pilbara water is contested industrial water. Do not assume municipal or evaporative supply.
CoolingLake Liddell and closed-loop liquid are the thermal hypothesis. Evaporative towers exist at Bayswater for generation, not for a campus.Tropical dry/wet bulb is a first-order opex. Liquid, closed-loop and non-evaporative architectures are the rational default. Raw water (Ross Dam pipeline in design) is industrial water, not a municipal-water story, and is not operating.Extreme heat and cyclone. Non-evaporative liquid is the conservative architecture. Water for evaporative plant should not be assumed.Desert/cyclone. PH1 used 55 °C-rated condensers. High-density liquid is the only serious architecture above a few MW.
ClimateUpper Hunter — hot summers, industrial water assets.Tropical northern Australia — wet season, cyclone season, high dry-bulb.Tropical monsoon. Heat and humidity are severe.Hot desert / cyclone coast.
PlanningHub enabling works underway. Compute not approved.Precinct exists. Compute not applied for.Announced. Not approved.SIA exists. Hyperscale compute not applied for.
Sovereign valueNo special defence adjacency evidenced.Proposition B sits in the city (JCU, Lavarack, NQ SPARK), not automatically on the 2,200 ha pad.Darwin defence geography is real. The Weddell gas campus is not automatically a sovereign facility.Not the primary evidenced demand.
Expansion250–1000 MW100–500 MW250–2000 MW100–500 MW
Environmental riskExpect power-station residues. RAP-level detail not extracted here.Not a Qenos-class contamination object. Confirm per lot.Not a petrochemical RAP story. Confirm.Industrial. Confirm.
Development riskRetired nameplate is not a connection offer.The most important unknown is connectable MW in 2028/2030/2032/2035. Theoretical REZ energy is not an answer.Announced GW is the failure mode this product exists to catch.Iron processing and hydrogen are the evidenced land uses.