Australia grid view
Infrastructure exists. Capacity may not be connectable.
An adjacent transmission line is not spare megawatts. A retired 2 GW station is not a connection offer. A REZ is not a 2028 campus feeder. Adapters are named so the next phase has somewhere honest to land.
- Proposed
AEMO
Generation register, connections, ISP. No live ingest in v0.1.
- Committed
Powerlink
CopperString Eastern Link and Flinders Substation are manually evidenced.
- Proposed
Transgrid
Hunter/Liddell NSP. No published spare-MVA extract.
- Proposed
AusNet
Victorian transmission. Altona parcel NSP not verified.
- Proposed
ElectraNet
South Australia adapter reserved.
- Proposed
Western Power
SWIS. Perth backhaul geography.
- Proposed
Horizon Power
NWIS / Pilbara. Isolated system.
- Proposed
NT networks (PWC)
Darwin–Katherine is not the NEM. Weddell assumes own generation.