Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

SITE-AU-QLD-CAIRNS-001

Cairns — Pacific-facing edge

16.920°S 145.780°EREQUIRES VERIFICATIONPreliminary
Announced
None
5-year scenario
10–40 MW
Likely energisation
Not dated

Cairns — Pacific-facing edge

16.920°S 145.780°E

Sentinel-2 cloudless 2024 · pad not a survey

Pacific face.

Read this pad as

Three desks

Developer

Can I get a pad, a connection, and cooling without waiting a decade?

  • A city network is not a 250 MW offer.
  • Time to power — likely not dated. Small edge vs large campus are different clocks.
  • Tropical cyclone coast. Closed-loop for anything dense.

Financier

What MW is actually deliverable, and what would break the case?

  • Announced none MW · 5-year scenario 10–40 MW (preliminary).
  • A named edge project with MW.
  • No verified financing for a compute campus on this site.

Mayor / state

What is real on this land, and what would fail in public?

  • n/a
  • Pacific face.
  • The failure mode is treating Cairns as Lansdown.

Deliverable MW

Announced is not deliverable

Ranges are scenarios with an infrastructure class and a confidence band. They are not a grid offer.

  1. Today

    0–10 MW

    Regional rooms may exist. No hyperscale campus evidenced. Bound is a placeholder, not a census.

    Preliminary

  2. +3y

    5–20 MW

    Edge/regional growth, not training campuses.

    Preliminary

  3. +5y

    10–40 MW

    Still not hyperscale.

    Preliminary

  4. +10y

    10–50 MW

    Pacific edge and sovereign services remain the product.

    Preliminary

  • Cairns is in the atlas so it is not silently converted into a Townsville-style pad. The product is edge, defence, health, research, PNG/Pacific connectivity.

Why here

  • Pacific face.
  • Defence/health/research.
  • To prevent hyperscale flattening.

What is missing

  • A named edge project with MW.
  • Cable opportunity evidence that is more than a map glance.

Time to power

Earliest is not likely

Earliest plausible
2029
Likely

Small edge vs large campus are different clocks.

Energy

Exists ≠ connectable

A city network is not a 250 MW offer.

NEM QLD — Ergon · Ergon Energy Network

Workload fit

  • Edge / regionalFitsThe actual product.
  • Sovereign / defenceConditionalFNQ and Pacific operations, health, research.
  • AI inferenceConditionalRegional inference, not national training.
  • AI training / HPCFailsDo not automatically treat Cairns as hyperscale.
  • Cloud / hyperscaleFailsWrong land and power class.
  • Industrial / mining AIUnknownNot the primary geography.

Required for scale

  • 50 MWPreliminary

    Would already be a different project class than the one this object describes.

Fibre

Pacific-facing opportunities are a research question (PNG/Pacific), not a built CLS in this seed.

  • Brisbane: 18 ms
  • Port Moresby: ms

Thermal / hazards

Wet tropics.

Tropical cyclone coast. Closed-loop for anything dense.

Cyclone: Design-level.

Development

landControl
Urban/regional. Fragmented.
planning
No hyperscale project.
environmental
Wet tropics / GBR adjacency is a planning fact for large industry.
approvalStatus
n/a
remediation
n/a
contamination
n/a
tenure
Mixed.
construction
n/a

Risk

  • demand

    The failure mode is treating Cairns as Lansdown.

Graph

  • cairnsCANDIDATE_FORPacific-facing edge

Evidence

No evidence objects attached. Absence is not a low score.