Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

Major

AirTrunk

Hyperscale wholesale campuses for cloud and AI providers.

LIVEModerate confidencePrivate — Blackstone / CPP Investments consortium (2024)

Three Sydney campuses, two Melbourne campuses. Founder Robin Khuda.

HQ Sydney

Built MW
Not extracted
Contracted
Announced / pipeline
1239

Operator-stated campus capacities: SYD1 121 MW+, SYD2 158 MW+, SYD3 330 MW+, MEL1 276 MW+, MEL2 354 MW+ (Dec 2025). Sum ~1.24 GW is announced/planned deployable campus capacity, not a built or energised census. SYD3 is in phased construction/expansion.

Campuses

CampusLocationAnnounced MWBuilt MWStage
SYD1Western Sydney121operational
121 MW+ stated.
SYD2Sydney158operational
158 MW+ stated.
SYD3Western Sydney330construction / expansion
330–400+ MW campus statements vary by date. Phased.
MEL1Melbourne276operational / expanding
276 MW+ stated.
MEL2Melbourne north-west354site acquired / planned 2H 2027
354 MW stated. Not energised.

Why watch

  • The Australian-founded hyperscale platform. Not a junior.
  • Western Sydney (SYD3) is the grid-constraint case in miniature — shared-connection BESS announced to ease load.
  • APAC expansion (Johor, Osaka, Hong Kong, Saudi, India stated).

What is missing

  • Built vs announced split per campus.
  • Independent grid-offer status at SYD3 / MEL2.

Related pads: NSW-BOTANY-QENOS-001VIC-ALTONA-QENOS-001

Evidence

  • Moderate confidenceProposed

    AirTrunk stated five Australian campuses totalling more than 1.2 GW of deployable capacity (SYD1–3, MEL1–2). That is operator-stated campus capacity, not a built census.

    AirTrunk · AirTrunk expands Australian platform with MEL2 · published 2025-12-23 · accessed 2026-09-18