Australia firstSentinel-2 mosaic liveOpen-Meteo liveGrid adapter offAnnounced ≠ deliverable

Junior / specialist

Mousterian

Water-adjacent and floating data centres. Liquid-cooled, >200 kW/rack, zero municipal water claimed. Samsung Heavy Industries engineering partner. 50 MW IT per moored unit in the 2026 contract.

LIVEModerate confidence

No Australian project in this seed. Australian pads are screened as candidates only.

HQ Dallas, Texas

Built MW
0
Contracted
Announced / pipeline
50

50 MW is a published unit size, not an Australian MW. Project Zeus (~500 MW Houston) and Sandpiper (~860 MW San Jose) are US plans. Zero Australian energised MW.

Campuses

CampusLocationAnnounced MWBuilt MWStage
FDC unit (design)Shipyard / US first deployment Texas500engineering
SHI contract Aug 2026. Not AU.
Project ZeusHouston (plan)5000plan
Hybrid floating/land. Not energised.

Why watch

  • The floating / zero-municipal-water architecture DataSentinel already tests against Australian waterfront pads.
  • Factory/shipyard construction is the schedule thesis — unverified in Australia.

What is missing

  • An Australian site, consent, and grid or generation path.

Related pads: VIC-ALTONA-QENOS-001NSW-BOTANY-QENOS-001NSW-NEWCASTLE-HUNTER-001NSW-LIDDELL-001

Evidence