planning lodged
Supernode North BESS (Solquartz)
Three 260 MW / 8 h batteries. Storage for industrial/silicon, not a compute campus. Announced MW is BESS power, not IT load.
REQUIRES VERIFICATIONModerate confidence
- Announced MW
- 780
- Power secured MW
- —
- Developer / operator
- Solquartz / Quinbrook / —
- Energisation
- Not dated — DA lodged; construction not evidenced as commenced.
Evidence
- Moderate confidenceProposed
Solquartz lodged a development application for three 260 MW / 8-hour BESS units (Supernode North), described as a catalyst for a proposed Powerlink 275 kV substation at Lansdown.
Industry Queensland · Solquartz forges ahead as Lansdown takes shape · published 2025-09-22 · accessed 2026-09-18